Iowa Collaborate for Mississippi River Bridge

blog

The distinctive 800-ft-long, 164-ft-tall “basket handle” true arches of the new Interstate 74 Mississippi River Bridge have yet to rise, but the $1.2-billion project connecting Moline, Ill., and Bettendorf, Iowa, has made significant progress since construction began in July 2017.

Powered by WPeMatico